What-if schedule analysis: test a delay with a worked example
What-if analysis of a schedule means changing one assumption (a task's duration, its start or who does it) and recalculating every date to see what moves before the change is real. It shows which delays push the finish date, which are absorbed by spare time, and where one person becomes a bottleneck.
How do you run a what-if test on a project schedule?
Run a what-if test by changing one thing at a time and comparing the new finish date with the current one. These 5 steps cover most cases:
- Give every task a duration. A schedule without durations cannot be recalculated, so estimate in working days, even roughly.
- Link only the tasks that really wait. Record a finish-to-start wait only where one job physically needs another one finished.
- Assign one person per task. Nobody can do two tasks at once, so a shared person can delay work that has no link at all.
- Change a single assumption. Add a delay, lengthen a task or swap the person, but never all three together, or you will not know which change caused the shift.
- Read what moved, then decide. Note which tasks and which finish date changed, and only then accept, adjust or discard the test.
The guide to when a project will finish explains how each of those dates is worked out in the first place.
What happens to a renovation schedule when one task slips?
The table below is an example: a flat renovation (bathroom and kitchen) scheduled Monday to Friday, with 6 hours of task work a day, so «1 day» means 6 hours. Each person does one task at a time. Work starts on Monday 30 November 2026 and the project finishes on Friday 18 December 2026.
| Task | Who | Duration | Waits for | Starts | Finishes |
|---|---|---|---|---|---|
| Demolition and debris removal | Pablo | 2 days | — | Mon 30 Nov | Tue 1 Dec |
| Install the plumbing | Marta | 2 days | Demolition and debris removal | Wed 2 Dec | Thu 3 Dec |
| Install the electrics | Jordi | 3 days | Demolition and debris removal | Wed 2 Dec | Fri 4 Dec |
| Patch chases and plaster the walls | Pablo | 3 days | Install the plumbing, Install the electrics | Mon 7 Dec | Wed 9 Dec |
| Tile the bathroom and kitchen | Pablo | 4 days | Patch chases and plaster the walls | Thu 10 Dec | Tue 15 Dec |
| Paint | Lucía | 2 days | Tile the bathroom and kitchen | Wed 16 Dec | Thu 17 Dec |
| Fit the kitchen and bathroom fixtures | Marta | 2 days | Tile the bathroom and kitchen | Wed 16 Dec | Thu 17 Dec |
| Final clean | You | 1 day | Paint, Fit the kitchen and bathroom fixtures | Fri 18 Dec | Fri 18 Dec |
Two features of this plan decide every what-if result. Plumbing (2 days) and electrics (3 days) both wait for demolition, and plastering waits for both, so plumbing has one day of spare time. The chain from electrics through plastering and tiling has no spare time at all; that chain is the critical path, worked out step by step in the critical path renovation example.
Which delays move the finish date of the renovation example?
Testing six changes one by one on the example gives these results:
| Change tested | What moves | Effect on the finish |
|---|---|---|
| Plumbing takes 1 extra day | Nothing: it now ends with the electrics on Fri 4 Dec | No change |
| Plumbing takes 2 extra days | Plastering and everything after it | One working day later |
| Electrics take 1 extra day | Plastering, tiling, paint, fixtures and final clean | One working day later |
| Tiling takes 1 extra day | Paint, fixtures and final clean | One working day later |
| Paint takes 1 extra day | Only the final clean | One working day later |
| Marta does the electrics instead of Jordi | Marta does both jobs in turn, so plastering waits | Two working days later |
The first row is the useful surprise: a one-day slip in plumbing costs nothing, because the electrics take longer anyway. The last row shows a different kind of risk. No wait between tasks changed, yet the end moved, because one person cannot install pipes and cables at the same time.
Why test a schedule delay before it happens?
First estimates tend to be optimistic. Buehler, Griffin and Ross's study of the planning fallacy found that people underestimate how long their own tasks will take, even when they remember similar tasks running late. HM Treasury's guidance on optimism bias asks appraisers to adjust estimates for this systematic tendency instead of trusting the first figure.
What-if tests expose the slips that hurt most. Flyvbjerg and Budzier's article on IT project risk argues that some projects overrun far beyond the average, so the useful question is which single slip does the most damage. The GAO Schedule Assessment Guide counts a schedule risk analysis among its best practices; a manual what-if test is the lightweight version for small teams.
How do you try a what-if test without touching the real plan?
A test must not change the plan until you choose to keep it. In tokidu, the project manager by Sinergia Barcelona, this is called «What if it's delayed?»: on the Map you try a delay, another duration or another person and see what moves before it happens, and nothing changes until you save. It is part of every plan, Free included, and the «Why that date?» sentence explains what pushes any planned date. You can see how it behaves in the interactive planner demo.
With a spreadsheet, the same rule means testing on a copy of the sheet and deleting the copy once you have read the result.
How do saved what-if tests compare with baselines in Project and Planner?
A saved what-if test keeps a possible future; a baseline freezes the agreed plan so you can compare it with what actually happened. The table compares what each tool keeps, according to Microsoft's pages as checked on 29 September 2026. The last row is our own product, so weigh it accordingly.
| Tool | What it keeps | Source |
|---|---|---|
| Microsoft Project desktop | Up to 11 baselines per project, plus interim plans | Microsoft Support on Project baselines |
| Microsoft Planner | One baseline per plan, in Plan 3 | Microsoft's Planner baseline update |
| tokidu | «Saved tests»: up to 20 what-if tests per project, Max plan, not on sale yet | Our own product |
Both Microsoft tools do better when you need a formal record of the agreed plan: Project desktop keeps several baselines and interim plans to report against, as Microsoft's baseline guide for Project explains. For measuring slippage after the fact, see the planned vs actual Gantt guide.
Which 3 mistakes make a what-if test of a schedule misleading?
- Changing several things at once. If you add a delay and swap a person in the same test, you cannot tell which change moved the date.
- Leaving tasks without durations. A task with no duration cannot push anything, so the test looks calmer than reality.
- Ignoring who does the work. As the electrics example shows, a busy person can delay a project even where no task waits for another.
Frequently asked questions
What is a what-if analysis in project scheduling?
A what-if analysis in project scheduling changes one assumption, such as a task's duration, its start or the person assigned, and recalculates the dates to show what moves. It reveals which delays push the finish date and which are absorbed by spare time, before anything has actually slipped.
Is a what-if test the same as a baseline?
A what-if test is not the same as a baseline. The test explores a possible change to the future plan, while a baseline freezes the agreed plan so you can later compare it with what actually happened. Many teams use both: baselines for reporting, what-if tests for decisions.
Why does a delay in one task sometimes not change the end date?
A delay in one task leaves the end date unchanged when that task has spare time, because a parallel task that the next step also waits for takes longer anyway. In a renovation, plumbing can slip slightly without effect if the electrics finish later.
Can a what-if test change the real schedule by accident?
A what-if test should never change the real schedule by accident, so keep tests apart from the live plan. In tokidu, «What if it's delayed?» changes nothing until you save; with a spreadsheet, run the test on a copy of the sheet and delete it afterwards.
Sources
- Create or update a baseline or an interim plan in Project desktopsupport.microsoft.com
- Announcing updates to the Baseline feature in Microsoft Plannertechcommunity.microsoft.com
- GAO Schedule Assessment Guide: Best Practices for Project Schedulesgao.gov
- Green Book supplementary guidance: optimism biasgov.uk
- Buehler, Griffin y Ross (1994): Exploring the «planning fallacy»: Why people underestimate their task completion timesdoi.org
- Flyvbjerg y Budzier (2011): Why Your IT Project May Be Riskier Than You Thinkhbr.org
Written with the help of AI from tokidu's real data and features, and checked automatically before publishing.